In order to examine the load-bearing capacity of Klingerbrücke in Leipzig, the Supporting Structures and Noise Abatement division of MFPA Leipzig GmbH carried out load testing using the company’s own load testing vehicle (BELFA).

The objective was to review the structure’s reaction to a future additional load from new trams using the bridge under realistic conditions in a set period of time. After the measuring technology had been set up and installed, the tests were carried out in multiple load levels, steps and cases based on the structure’s bending.

You are currently viewing a placeholder content from YouTube. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.

More Information

More projects

Foto brennender Fahrzeuge während eines Tunnelbrands Versuch im Brandschutz

Simulation of large-scale fires in road tunnels

Full-scale puddle fire test in the testing tunnel of MFPA Leipzig in order to validate existing CFD…

Read More

Hydraulische Vertikalbelastung mehrerer Stahlträger bei einem Brandversuch

Fire resistance testing of a wall/ceiling connection made of solid wood elements

MFPA Leipzig GmbH developed a corresponding test set-up to verify smoke tightness (in relation to…

Read More

Blick in eine im Rohbau befindliche Tunnelröhre mit Baustellenbeleuchtung

Concrete-technology support for PP fibre concrete tunnel construction projects

Concrete technology support for tunnel construction projects using PP fiber-reinforced concrete,…

Read More