In order to examine the load-bearing capacity of Klingerbrücke in Leipzig, the Supporting Structures and Noise Abatement division of MFPA Leipzig GmbH carried out load testing using the company’s own load testing vehicle (BELFA).
The objective was to review the structure’s reaction to a future additional load from new trams using the bridge under realistic conditions in a set period of time. After the measuring technology had been set up and installed, the tests were carried out in multiple load levels, steps and cases based on the structure’s bending.
More projects
Stress corrosion examination on bridge structures
In order to assess the current condition of the structure, prestressing steel, grout and parts of…
Load testing in the context of converting the former Aktienspinnerei building in Chemnitz into the central library of the Chemnitz University of Technology
Experimental structural safety verification of historical cast iron columns in the old Chemnitz…
Simulation of large-scale fires in road tunnels
Full-scale puddle fire test in the testing tunnel of MFPA Leipzig in order to validate existing CFD…