In order to examine the load-bearing capacity of Klingerbrücke in Leipzig, the Supporting Structures and Noise Abatement division of MFPA Leipzig GmbH carried out load testing using the company’s own load testing vehicle (BELFA).

The objective was to review the structure’s reaction to a future additional load from new trams using the bridge under realistic conditions in a set period of time. After the measuring technology had been set up and installed, the tests were carried out in multiple load levels, steps and cases based on the structure’s bending.

More projects

Nahaufnahme eines Querschnitts einer Entwicklung eines Aluminiumschaumverbunds

ICEx – development of an end car cabin made of foamed aluminium composite

Research, development and experimental testing, as well as application of innovative lightweight…

Read more

Foto brennender Fahrzeuge während eines Tunnelbrands Versuch im Brandschutz

Simulation of large-scale fires in road tunnels

Full-scale puddle fire test in the testing tunnel of MFPA Leipzig in order to validate existing CFD…

Read more

Stress corrosion examination on bridge structures

In order to assess the current condition of the structure, prestressing steel, grout and parts of…

Read more