In order to examine the load-bearing capacity of Klingerbrücke in Leipzig, the Supporting Structures and Noise Abatement division of MFPA Leipzig GmbH carried out load testing using the company’s own load testing vehicle (BELFA).
The objective was to review the structure’s reaction to a future additional load from new trams using the bridge under realistic conditions in a set period of time. After the measuring technology had been set up and installed, the tests were carried out in multiple load levels, steps and cases based on the structure’s bending.
You are currently viewing a placeholder content from YouTube. To access the actual content, click the button below. Please note that doing so will share data with third-party providers.
More InformationMore projects
ICEx – development of an end car cabin made of foamed aluminium composite
Research, development and experimental testing, as well as application of innovative lightweight…
Project for optimising energetic biomass use
Monitoring of constructional parameters and optimisation of material properties when using steel…
Simulation of large-scale fires in road tunnels
Full-scale puddle fire test in the testing tunnel of MFPA Leipzig in order to validate existing CFD…


