In order to assess the current condition of the structure, the Materials and Construction Physics division of MFPA Leipzig GmbH extracted and examined prestressing steel, grout and parts of the concrete covering the cladding tube from a bridge structure.
For a stress corrosion examination, prestressing steel is usually removed from structures for examination, if danger due to stress corrosion is suspected based on the stress corrosion guideline of the German Federal Ministry of Transport, Building and Urban Development.
More projects
Potential field measurement for assessing corrosion processes
Non-destructive potential measurement is used to assess corrosion processes on the reinforcement of…
Mounting systems according to EAD 280016-00-0602
Characterization of the performance properties under ambient temperature and in case of fire
Non-destructive measurement of permeability of concrete
Non-destructive measurement of permeability for the evaluation of concrete properties with respect…







