In order to assess the current condition of the structure, the Materials and Construction Physics division of MFPA Leipzig GmbH extracted and examined prestressing steel, grout and parts of the concrete covering the cladding tube from a bridge structure.
For a stress corrosion examination, prestressing steel is usually removed from structures for examination, if danger due to stress corrosion is suspected based on the stress corrosion guideline of the German Federal Ministry of Transport, Building and Urban Development.
More projects
Fire tests for the High Speed 2 (HS2) in the United Kingdom
The task of MFPA Leipzig GmbH was to record the damage and evaluate it in terms of materials and…
Laminated safety glass noise protection wall elements along railway tracks
The aim is to develop concrete proposals for providing proof of usability for the transparent…
High temperature tensile tests at up to 1,350°C
Investigation of the temperature-dependent mechanical properties of steel materials







